Bathroom Remodeling Archives - Colmena Construction https://colmenaconstruction.com/category/bathroom-remodeling/ Houston General Contractor Wed, 13 Dec 2023 01:30:07 +0000 en-US hourly 1 https://wordpress.org/?v=6.5.5 224773738 What to expect in doing a bathroom remodel https://colmenaconstruction.com/what-to-expect-in-doing-a-bathroom-remodel/ Sun, 03 Dec 2023 01:13:48 +0000 https://colmenaconstruction.com/?p=146 The post What to expect in doing a bathroom remodel appeared first on Colmena Construction.

]]>

A bathroom remodel can vary in scope, from minor updates to a complete overhaul. Here’s a general overview of what to expect during a typical bathroom remodeling project:

  1. Planning and Design: This phase involves defining the scope of the project, setting a budget, selecting a design, choosing materials, and creating a layout. You might work with an architect or designer to visualize the new space.
  2. Permits and Approvals: Depending on your location and the extent of the remodel, you may need permits from local authorities. Your contractor can help navigate this process.
  3. Demolition: This stage involves removing existing fixtures, tiles, flooring, and other elements that are being replaced. It’s a messy but necessary step in the process.
  4. Rough-In Work: This includes plumbing, electrical, and any structural changes. It involves moving or installing new pipes, wiring, or framing to accommodate the new design.
  5. Installation of New Fixtures: Once the rough-in work is done, installation of new fixtures such as tubs, showers, sinks, toilets, and cabinets takes place.
  6. Wall and Floor Finishing: This step involves installing new drywall, painting, tiling, or applying any other wall finishes. Flooring installation also happens during this phase.
  7. Final Touches: Installation of accessories, such as mirrors, lighting fixtures, towel racks, and other decorative elements, completes the project.
  8. Inspection: After the work is completed, a final inspection may be required to ensure everything meets building codes and regulations.

Throughout the process, communication with your contractor is key. Expect some disruption to your daily routine, especially during the demolition and construction phases. Keep an open line of communication to address any unexpected issues or changes that may arise.

Remember, timelines can vary depending on the complexity of the project, availability of materials, and any unforeseen complications. Flexibility and patience are essential during a bathroom remodel. It’s also wise to allocate a bit of extra budget for unexpected costs that may come up during the renovation.

Colmena Construction prides itself in the work we do and the customer service we thrive on providing. If you are considering a bathroom remodel in the greater Houston area, let Colmena be at least one contractor to get a quote from. We feel confident in our approach and fair pricing to go with outstanding work.

The post What to expect in doing a bathroom remodel appeared first on Colmena Construction.

]]>
146